電梯套門窗套安裝步驟及參數(shù)
2016-05-30 14:10:02 文章來源:3g9g.com
1、施工流程 :檢查安裝墻面、套口——定位與放線——檢查石塑線條和搭配側(cè)板——結(jié)構(gòu)膠涂點(diǎn)——安裝固定——清潔飾面
1, the construction process: check the installation wall, set mouth, positioning and Ray - stone check plastic lines and side plate structure glue Tu point collocation, fixed installation, clean finish
2、檢查安裝墻面、套口:檢查墻面和套口的安裝前提是否具備,檢查門套預(yù)留洞口尺寸是否符合設(shè)計(jì)要求,窗套檢查預(yù)留臺(tái)面是否符合尺寸。
2, check the mounting surfaces, set mouth: check the wall and the mouth of the installation premises have and check door reserved hole size is consistent with the design requirements, Chuangtao check reservation table are in accordance with the dimensions.
3、定位放線:根據(jù)設(shè)計(jì)要求,在實(shí)際位置做出基礎(chǔ)線,并保證整體方正。門套定位,壓框?qū)挾葢?yīng)保證余量尺寸一致。
3, positioning line: according to the design requirements, in the actual position to make the basic line, and to ensure that the overall founder. Door positioning, pressing frame should ensure the uniform size of margin width.
4、檢驗(yàn)石塑線條和側(cè)板:安裝前,檢查石塑線條和側(cè)板的尺寸、規(guī)格、加工質(zhì)量、特備零件的規(guī)格以及數(shù)量必須符合設(shè)計(jì)及規(guī)范要求。
4, test stone plastic lines and side plate: before installation, check stone plastic lines and side plate dimensions, specifications, processing quality, special parts of the specifications and quantity must comply with the design requirements and specifications.
5、結(jié)構(gòu)膠涂點(diǎn):在電梯套和門窗套所需的石塑線條和側(cè)板背部進(jìn)行結(jié)構(gòu)膠均勻打點(diǎn),間距為10-20CM為宜。
5, the structure of glue Tu point: required in the elevator and sets of doors and windows of stone plastic lines and side plate back structure glue evenly RBI, spacing 10-20CM is appropriate.
6、安裝固定:電梯套和門套安裝需對(duì)安裝部位首先量尺,處理接頭及轉(zhuǎn)角位置;設(shè)計(jì)無特殊要求,接頭應(yīng)成45°角;然后直接按照施工圖要求進(jìn)行上墻安裝。
6, fixed installation: set of elevator and door installation required on the installation location, scale, joints and corner position processing; design has no special requirements, the joints should be into a 45 degree angle, then directly in accordance with the construction requirements for wall mounting.
7、清潔飾面:安裝完工之后撕去飾面的保護(hù)膜,用抹布和肥皂水對(duì)勾縫出進(jìn)行清潔處理。
7, clean finish: protective film installation after completion of tear finishes, pointing out to clean with a rag and soapy water.